| |
Available INDONESIA origin Steam / Thermal Coal
GCV ADB (GAD) 5300-5100, 5500-5300, 5800-5600, 6300-6100, 6500-6300 kcal/kg
NCV ARB (NAR) 3800-3600, 4200-4000, 4000-3700, 4700-4500, 5000-4800, 5500-5300, 5300-5100, 5800-5600 kcal/kg
SPECIFICATION ATTACHED.
MINIMUM ORDER QUANTITY 50,000MT/month
INCOTERMS AVAILABLE FOB MV, CFR port of dest., CIF port of dest.
PAYMENT by NON-TRANFERABLE, CONFIRM & IRREVOCABLE SWIFT MT-700 L/C
PAYMENT SCHEME:
For FOB MV Incoterms; L/C 100% payable after SGS/CCIC/SUCOFINDO/GEOSERVICES inspection at the port of loading, AT SIGHT.
For CFR or CIF port of destination, available two (2) payment scheme, 98%-2% and 95%-5% and accept 60 to 90 days usance L/C.
Scheme 98%-2%
------------------------
L/C 98% payable 60 to 90 days after SGS/CCIC/SUCOFINDO inspection at the stockpile port of loading, 2% remaining payable after CIQ/SGS/CARSURIN inspection at the port of destination, AT SIGHT
Scheme 95%-5%
------------------------
L/C 95% payable 60 to 90 days after SGS/CCIC/SUCOFINDO inspection at the stockpile port of loading, 5% remaining payable after CIQ/SGS/CARSURIN inspection at the port of destination, AT SIGHT
Please always provide Letter of Intent (LOI) or Irrevocable Corporate Purchase Order (ICPO) to enter into transaction.
|